Federal Ministry of Works to Close Road for Asphalt Resurfacing on Eko Bridge and Ramps

Federal Controller of Works, Lagos State, Engr.(Mrs) Olukorede Kesha.

The Federal Ministry of Works announces a planned road closure for essential asphalt resurfacing work on Eko Bridge and Ramps for eight weeks effective from Friday 20th September 2024 by 7am through 20th November, 2024.

A statement signed by Engr (Mrs)Olukorede Kesha, Federal Controller of Works, Lagos, noted that the closure will be full at some sections of the bridge and partial at other sections.

According to the statement, this critical project aims to improve road safety and enhance the driving experience of motorists, adding that the work involves milling of the existing asphalt and relaying new asphalt on the bridge and Ramps as well as address wear and tear and ensure a smoother, safer roadway.

The statement listed the Detours and Alternate Routes as follows:

Island from Funsho Williams Avenue: Service Lane at Alaka to connect Costain and access Eko Bridge.

Island: Access Costain to connect Eko Bridge and link Apongbon

Apongbon inwards Eko Bridge: Link Costain to access Funsho Williams Avenue

For Costain inwards Alaka/Funsho Williams Avenue: Pass through Apapa Road from Costain and link Oyingbo to access Adekunle then link to the Third Mainland Bridge

Surulere: Use Costain to link Breweries inwards the Abebe Village to connect Eric Moore/Bode Thomas.

“Residents and businesses within the closure zone are encouraged to plan accordingly.

“Safety Precautions: – Appropriate signage and traffic control measures will be in place to guide drivers and pedestrians.

“We apologize for any inconvenience this may cause and appreciate the public’s patience and cooperation as we work to improve our infrastructure.”

× How can we help you?