FG Opens 3rd Mainland Bridge in Lagos to Traffic

 

The federal controller of works, Lagos, Engr, (Mrs) Olukorede Kesha speaking to the news men before the reopening of the 3rd Mainland Bridge in Lagos.

 

 

Federal Government fully reopened the Third Mainland Bridge to traffic today and urges motorists to maintain speed limit,

The federal controller of works, Lagos, Engr, (Mrs) Olukorede Kesha announced the reopening of the bridge on Thursday.

She disclosed that the speed cameras would be displayed conspicuously at the median to capture motorists exceeding the limit on the Third Mainland Bridge.

The federal government, she said in collaboration with the Federal Road Safety Corps, has installed speed limit cameras on the Third Mainland Bridge to encourage responsible driving, preserve the bridge and improve safety.

Recall, the federal government began comprehensive rehabilitation of the bridge on January 9 due to several failed portions.

Engr Kesha, disclosed that the speed cameras would be displayed conspicuously at the median to capture motorists exceeding the limit, adding that anyone caught speeding would not face immediate penalties on the spot.

She said, “The speed limit has been designed to be 80km/per hour. So, if you speed past 80km in the next few weeks, your honourable commissioner will have you to contend with.”

Speaking on behalf of Works Minister, Engr. David Umahi, the federal controller of works

said, the successful completion of the first phase of the Rehabilitation works which was started and completed by the Bola Ahmed Tinubu led administration is a clear Indication that President Tinubu is working .

Senator Umahi called on all Nigerians to continue to have faith in the Renewed Hope Agenda of the President, maintaining however, that nothing good comes so easy.

The Minister revealed that work has already begun on the underwater damage to the bridge, which is the second phase of the Rehabilitation works on the bridge.

Similarly, the Minister said, Rehabilitation works will commence on the Carter bridge in the coming weeks, adding that the contractor has already been mobilised.

Engr Kesha noted that the bridge, which was fully opened to the public, still needed some additional work which includes installing solar lights and CCTV cameras.

She explained that they are doing this while the bridge is open so as not to disrupt traffic flow in the future.

She stated further that the main deck repairs would be finished by May 2024, adding that President Bola Tinubu would hold an official commissioning to mark the completion.

She said work would be done underneath the bridge and underwater.

She appealed to motorists to report breakdowns, saying, “If you see something, say something, and if you see a car being repaired on the bridge, you should report it by calling me or the police.

“We are going to talk with the governor. It is not to your joy or delight if your vehicle breaks down. So, you should be assisted instead of being penalised.”

In his remark, the Commissioner for Transportation, Lagos State, Oluwaseun Osiyemi, corroborated Keisha’s statements, urging people to comply.

“You will see speed limit signs as from today and the speed cameras will come on; the speed limit for Third Mainland Bridge is 80km per hour, so the speed cameras are there.

“So if you go beyond the speed limits, what it does is take a picture of your car and your number plate; we have a database, and we have our ways of sending your bills to you,’’ the commissioner said.

PHOTO NEWS

The federal controller of works, Lagos, Engr, (Mrs) Olukorede Kesha  flanked by the Commissioner for Transportation, Lagos State, Oluwaseun Osiyemi, and others as she declares open the 3rd Mainland bridge in Lagos.

 

 

× How can we help you?