Red Line: LASG announces 9 Weeks Traffic Diversion at Muritala Muhammed Way, Others
Following the construction of Red Line project, the Lagos State Government has announced traffic diversion on Muritala Mohammed Way and Apapa Road, Oyingbo from Jan. 23, 2023 till March 31, 2023 The Commissioner for Transportation, Dr Frederic Oladeinde, said in a statement in Lagos on Thursday that the traffic diversion would last for nine weeks.

Oladeinde disclosed that the total lane closure would be sustained to allow the contractor to complete the construction without any inhibition during the course of the construction of the First Phase of the Lagos Rail Mass Transit, Red Line project.
Oladeinde said that the previous alternative routes would be maintained as well.
According to him, traffic on Muritala Mohammed way would be diverted to Abeokuta Street to access Borno Way to Coates Street to link Muritala Mohammed Way again.
Oladeinde explained that motorists could alternately access their destinations from Cemetery Street, adding that traffic on Apapa Road will be accommodated with the temporary lanes constructed before the overpass and will be channelised to two lanes on Muritala Mohammed Way.
The commissioner noted that the site would be cordoned off for the safety of the citizenry, adding that emergency vehicles would be on ground to tow broken down vehicles along the axis.
The Commissioner for Transportation, also stated that signages would be placed on the access roads with the state’s Traffic Management Authority to manage traffic flow and minimise inconveniences
He reassured of the state government’s commitment toward the development of transport infrastructure within the metropolis.
Oladeinde pointed out that it was vital for the Multi-Modal transportation system of the state government which would in turn boost the economic prowess of the citizenry.