Umahi Invites Directors of FERMA Engineers in Edo, Delta, Bayelsa, Akwa Ibom over failures on East West Road

  • Minister passes vote of no confidence on the construction of East West Road
L-R Director Highway South South, Engr C.A Ogbuagu, Hon. Minister of Works, H.E. Sen (Engr) David Nweze Umahi, CON during the inspection of the failed sections of the Dualization of the East–West Road Section II(Ahoada to Kaiama) 54km in Bayelsa/Rivers States on the 19th September, 2023

 

The Honourable Minister of Works H.E Sen (Engr ) David Nweze Umahi  in his continuous assessment of the Nigerian roads has travelled by road from  Abuja, through Kogi, Edo, Delta , Bayelsa up to Port Harcourt in Rivers State through the famous much talked about  East West road to inspect the progress of work on the highway by himself on  Tuesday the 19th of September,2023.

The Minister said  “ I have invited  all the Directors of Federal Roads Maintenance Agency (FERMA) with their engineers from Edo , Delta , Bayelsa and Akwa Ibom , they should be able to attend to the small failures  and redeem all the places that  failed on the road  and  I will hold a meeting with Niger Delta Development Commission (NNDC ) Managing Director  this evening  to find out  how we can collaborate on this road”

On the East West road he said he had discussed with the Edo State  Governor that the  East West road passed through his state and that was what is causing the traffic jams and hold up, he said they have to design a bye pass, so that the heavy trucks can stop ,moving through the town , it is by so doing that the gridlock can be  stopped and business activity in the state can improve.

Umahi said “We have to look at our constituency projects to see how our constituency projects can be meaningful  and impactful and I will be discussing this with the leadership of the House of Representative and the Senate “

While berating SETRACO construction company working on the  East West road  the Minister said “ the gimmicks the contractors are using is excuse of  overloading,

I am passing A VOTE OF NO CONFIDENCE  on the construction of this road ,  I wont certify anything on this road , the road has failed and it is not acceptable to us.  the road  is full of pot holes , we have paid over N71b and the road has completely gone down, and the road has been further  reviewed from N44b to 144b billion , apart from the beautiful bridge you have built , the road has completely gone down , project manager tell your team to meet me in Abuja on Monday to tell me  what has caused the failure on the road, I do not accept it is overloading truck, our roads are not properly being constructed and I demand that these roads must be properly constructed , it is a fight that Nigerians must win and Mr. President must win this fight for the sake of the Nigerian people to truly enjoy the dividends of a democratic Government.

× How can we help you?